Biogasanlage Homberg (Efze) / Hessen

Location: Homberg (Efze)
Plant Capacity: 350 Nm3/h Methane
Input Material: (liquid) manure and renewable resources
Area:
Photo Gallery

GreenGasanlage Rathenow / Brandenburg

Location: Rathenow
Plant Capacity: 520 Nm3/h Methane
Input Material: renewable resources
Area:
Photo Gallery

Biopower plant Midlum:

Location: Wursten County, Lower Saxony
 download poster as PDF (German)

Biogas-Facility Zehna:

Location: 18276 Zehna, Mecklenburg - Vorpommern
 download poster as PDF (German)

Biogas-Facility Friedrichshagen- Mecklenburg-Vorpommern:

Location: D –17379 Wilhelmsburg/Friedrichshagen
Plant Capacity: 2.7 MW (electrical)
Input Material: (liquid) manure and renewable resources
Area: Approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG); blueprint, preliminary and implementation planning

Biogas-Facility Simmerhausen - Lower Saxony: (not built yet)

Location: D – 27243 Prinzhöfte/ OT Simmerhausen
Plant Capacity: 2.0 – 4.0 MW (electrical)
Input Material: (liquid) manure and renewable resources or other types of biodegradable wastes
Area:

Execution of a technology competition for EWE AG Oldenburg – 2 possibilities as a renewable resources or waste treatment facility

Biogas-Facility Görlsdorf - Brandenburg:

Location: D – 15926 Görlsdorf
Plant Capacity: 800 kW (electrical)
Input Material:  (liquid) manure, renewable resources and biodegradable waste
Area:  Approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG); blueprint, preliminary and implementation planning

Biogas-Facility Claußnitz - Saxony :

Location: D – 09236 Claußnitz
Plant Capacity: 626 kW (electrical)
Input Material: (liquid) manure and renewable resources
Area:

Approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG); blueprint, preliminary and implementation planning, construction work and management,
commissioning, acceptance tests, detailed planning, hydrogen desulphurisation, technological support and optimisation during the operating phase

Biogas-Facility Lüchow - Lower Saxony:

Location: D – 29439 Lüchow
Plant Capacity:   3.4 MW (electrical)
Input Material:   (liquid) manure and renewable resources
Area:  acceptance tests, assessment of target and actual state, addition of anaerobic initial stage, building application, detailed planning of hygienisation

Biogas-Facility Karstädt - Brandenburg:

Location: D – 19357 Karstädt
Plant Capacity: 950 kW (electrical)
Input Material: (liquid) manure and renewable resources as well as biodegradable wastes
Area: detailed planning, exhaust system, fermentation tests

Biogas-Facility Alteno - Brandenburg:

Location:  D – 15926 Duben
Plant Capacity: 1,252 MW (electrical)
Input Material:  organic waste and biogenic residues, without manure
Area: Approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG); blueprint, preliminary and implementation planning, construction work and management, commissioning, approvals

Biogas-Facility Neubukow- Mecklenburg/Vorpommern:

Location: D –18233 Neubukow
Plant Capacity: 938 kW (electrical)
Input Material: (liquid) manure and renewable resources as well as biodegradable wastes
Area:

blueprint, preliminary and implementation planning, construction work and management, commission, approvals

Biogas-Facility Vietlübbe - Mecklenburg/Vorpommern:

Location: D – 19386 Vietlübbe
Plant Capacity: 220 kW (electrical)
Input Material: (liquid) manure and renewable resources as well as biodegradable wastes
Area: planning, approval and implementation, commission

UASB Wastewater Treatment Plant MSP  -  Tangermünde - Saxony-Anhalt:

Location:  D – 39590 Tangermünde
Plant Capacity: UASB- wastewater treatment plant based on the SBR-principle and methane reactors for biogas generation
Input Material: industrial water and wastewater
Area:

Approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG); blueprint, preliminary and implementation planning, construction work and management, commission, approvals, extension of the fermentation stage, facility monitoring

Biogas-Facilities in the heat stations of HARPEN EKT GmbH (limited) Berlin: 

Location: thermal power and central heating plants in 3 laender (federal states of Germany)
Plant Capacity: 1.5 MW el.
Input Material: (liquid) manure and renewable resources
Area: blueprint and preliminary planning, profitability analysis, input counselling, cultivation trials of energy crops
Location: 14669 Ketzin
Plant Capacity: 2.8 MW el., CO2 generation for EU research project
Input Material: (liquid) manure and renewable resources
Area: blueprint and preliminary planning, application for funding from ILB Brandenburg, tendering of facility according to service description and product range

Biopower plant Land Wursten - Lower Saxony: (Construction started 08/2005)

Location: D – 27570 Nordholz
Plant Capacity: 1.8 MW (electrical)
Input Material: (liquid) manure and renewable resources
Client:

Biokraft Nordholz GmbH & Co. KG blueprint and permit planning according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG), functional tendering of the facility with product range and tendering of subassemblies by single lots and assembly units, implementation of the facility  07/2005 to 07/2006 by a joint venture, overall construction and project management, Inbetriebnahme-Kontrolle

Biomass power plant Grevesmühlen – Mecklenburg/Vorpommern:

Location: D – 23936 Grevesmühlen
Plant Capacity: 1.0 MW (electrical)
Input Material: (liquid) manure and renewable resources
Client:

Municipal administration union Grevesmühlen detailed design, feasibility study

Biomethane facility Schweringen - Lower Saxony: (start of construction 08/2005)

Location: D – 27333 Schweringen
Plant Capacity: 1.0 MW (electrical), utilisation of steam
Input Material: (liquid) manure and renewable resources
Client:

Raiffeisen Warengenossenschaft Grafschaft Hoya eG

Detailed design for approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG), tendering, general engineering, construction management and implementation of the plant

 download poster as PDF (German)

Concentrated feed plant Mittelweser Heide – Lower Saxony:

Location: D – 27333 Schweringen
Plant Capacity: > 300 t/a output (mill)
Client: Raiffeisen Kraftfutterwerk Heide GmbH

Planning for approval according to the federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG) column 1, no. 7.21

AGRAVIS Raiffeisen AG Münster:

Location: Lower Saxony, NRW
Plant Capacity: 300 kW to 1.0 MW (electrical)
Input Material:  variable, (liquid) manure and renewable resources
Client: AGRAVIS Raiffeisen AG Münster
Area: design and development of standard facilities

Vegetable oil-powered BTTP  - Lower Saxony:

Location: D – 27324 Eystrup
Plant Capacity: 150 kW electrical installed capacity
Client:

Raiffeisen Warengenossenschaft Grafschaft Hoya eG

planning to approval according to § 75 of the German building law

GrennGasanlage Rathenow – Brandenburg: (planned)

Location: 14704 Rathenow
Plant Capacity: 1000 Nm³ raw gas production
Input Material: Renewable resources, ">(liquid) manure
Client: GreenGas Produktionsanlage Rathenow GmbH & Co. KG
Area: Detailed design for approval

Biogas plant Heinersdorf – Brandenburg

Location: 15518 Heinersdorf
Plant Capacity: 2 MW electrical capacity
Input Material: Renewable resources,(liquid) manure, HTK
Client:

MILSANA Handels & Produktionsgesellschaft mbH

Area: planning for approval to the 4th federal law for the protection from ambient pollution (German: Bundes-Immissionsschutzgesetz, BImSchG)

Project studies for the public utility, gas and energy supplier

feasibility study, comparison of options, calculation of profitability, design of plants utilising renewable resources as well as processing and supplying biogas to the existing main for natural gas

Investment analysis of biomethane power plant with gas feed-in:

Input Material: (liquid) manure and renewable resources
Plant Capacity: 500 -1000 Nm³ raw gas production
Client: TEN Teutoburger Energie Netzwerk eG, Hagen a.T.W.
Area: Preliminary design, technology concept, base investigation, biomass analyses, profitability study while comparing available options

Biomethane production and phyto-decontamination:

Input Material: (liquid) manure and renewable resources
Client:

Clausthaler Umwelttechnik-Institut GmbH

                                               Univ.-Prof. Dr. Ing. Otto Carlowitz 

Area: Preliminary design, technology concept, base investigation, biomass analyses, profitability study, biogas processing

Speicherstadt (warehouse city) Potsdam – investment analysis:

Client:

SSP Speicherstadt Betreibergesellschaft mbH

14469 Potsdam

Economic and technical feasibility study of a GreenGas production facility with decentral conversion into electricity and use of fuel cells

Miscellaneous:

Member of the Federal Associacion for Biogenic Fuels (Bundesverband Biogene Kraftstoffe e.V., BBK e.V.)

Member of the Professional Association for Biogas (Fachverband Biogas e.V.)

Member of the Association of German Builders and Architects (Bund Deutscher Baumeister und Architekten e.V.)

Member of the Supporters of Renewable Energies (Förderverein Erneuerbarer Energien e.V.,  FEE e.V.)

Member of the Chamber of Engineers of Brandenburg (Brandenburgische Ingenieurkammer)

Authorization to present building documents in Brandenburg, Lower Saxony, Mecklenburg-Vorpommern, Schleswig-Holstein, Nordrhein-Westfalen

  • Technology partner of BBK e.V. in the field of the fermentation of slops from the production of bioethanol
  • Technology partner of the investment control group of BBK e.V. for the evaluation of projects for investors, banks and insurance companies
  • Technology partner of AGRAVIS Raiffeisen AG Münster
Selected references as of September 2005